Calculating compensation for property damage
Where works carried out on one property damage another, should compensation be payable on the basis of reinstatement costs or diminution in value? The High Court tackled that issue recently in the case of Lea Valley Developments Limited v Derbyshire.
The owner of a house had obtained an award under the Party Wall etc. Act 1996 that authorised a building project, including excavation works. The award required the owner to make good any decorative or structural damage caused to a neighbouring property, a block of flats, or to make payment in lieu.
The works caused damage to the block that was agreed to be so serious that it was beyond economic repair. The costs of demolishing and rebuilding the block were estimated at between £1 million and £2 million.
However, the house owner said that the diminution in the block’s value arising from the damage was between £500,000 and £1 million. The owners of both properties sought declarations as to the correct basis on which compensation was payable.
The Court rejected the owner of the block’s arguments that, on a true reading of the Act and the terms of the party wall award, there was no issue to be tried and that damages had to be calculated on a reinstatement basis. However, it also refused to grant the owner of the house a declaration that, as a matter of common law, the diminution in value basis necessarily prevailed.
The issue of whether reinstatement or diminution in value represented the correct approach to the assessment of damages was highly fact sensitive and dependent on a wide range of factors. There was no rule of law that prohibited awards on either basis or that required one to prevail over the other. It was thus inappropriate to resolve the issue without hearing detailed factual evidence.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..